因此,我们很有必要在理论上对土钉支护体系进行深入细化的研究。
Therefore, it is necessary to carry on theoretical study on soil nailing support system.
主要包括方案的选择,土钉墙与桩锚结合支护结构的支护体系设计,基坑开挖及监控测量。
Include choice of scheme, support system design of soil-nailing wall and anchor-pile composite supporting structure, excavate and monitor measurement in excavation engineering.
深圳地铁一期工程少年宫站开挖基坑围护结构采用1∶0.3的放坡结合土钉加预应力锚索联合支护体系。
Open-cut slopes of 1:0.3 gradient reinforced by soil nails and pre-stressed anchoring cables are adopted for the foundation pit of Shaoniangong station of phase 1 of Shenzhen Metro.
应用推荐