·2,447,543篇论文数据,部分数据来源于NoteExpress
研究了可用输电容量的计算问题。
The calculations of available transfer capability (ATC) of transmission networks are studied.
目前在求解可用输电容量(atc)时,容量效益裕度(CBM)的评估是根据预先设定的某一发电可靠性水平多次计算可靠性,进行迭代优化。
Capacity benefit margin (CBM) is evaluated and optimized via an iterative method based on a presumed generation reliability level when the available transfer capability (ATC) is calculated.
应用推荐