例如,变更控制管理人员将和弹性管理人员进行核实,以确保新解决方案不会影响现有后端系统。
For example, the Change Control Manager checks with the Resilience Manager to ensure that the new solution doesn't affect the existing back-end systems.
变更控制管理人员确保IT操作人员可以监视新解决方案,并确保配备了解决方案所需的常规过程。
The Change Control Manager ensures that the it Operator can monitor the new solution and that the housekeeping procedures required by the solution are in place.
而建设项目工程变更控制过程中,工程变更方案的技术经济评价是建设项目工程变更控制管理的重要环节。
The technology economic evaluation of construction change plan is the important link of construction project change management in the process of construction project change control.