...一门户 ent),产品配置管理(PCM,product configuration management),及工程变更管理(ECM,engineering change management)。
基于8个网页-相关网页
负责工程变更编号的发放与管理,工程变更的状态跟踪及文件存档;
Engineering change management. To register EC No. , track status and record the document.
本文介绍了与工程造价相关的工程计量签证、工程变更及竣工结算审核几个环节的相关管理。
This paper introduces the management of such links as project measurement verification, project alteration and completion audit relating to engineering project cost,.
而软件工程过程RUP采用面向对象的方法,在需求管理、分析设计、配置及变更管理等方面为开发人员提供准则和相应的管理工具。
Software engineering process RUP adopts the orient-object method, and it provides appropriate rules and tools in demand management, analysis designing, configuration and changing management for users.
应用推荐