... cobblestone appearance 铺路石样 cobblestone foundation 卵石基础 Cobblestone Tracks 鹅卵石路 ...
基于1个网页-相关网页
本文主要介绍应用“高喷”技术对安居水电站溢流坝、堰坝导墙、溢流堰天窗沙卵石基础处理的方法和体会。
This paper presents sand and cobble foundation treatment of overflow dam, guide wall and overflow weir by "high pressure jet grouting" at an in Hydropower Station.
卧室空间都包含在整个保护性的基础层中,这层使用鹅卵石代替普通石块来加强与周围环境的连接性。
The bedrooms are contained within the monolithic, protective base layer, which USES pebbles instead of standard rocks to enhance its connection to the surroundings.
石笼基础是由基地内的石块以及建筑周边挖掘冰河收集的鹅卵石组成的。
The gabion foundations are composed of rocks from the site, a selection of pebbles excavated from the surrounding glacial moraine.
应用推荐