群桩中桩身压缩由单桩静载试验得到的桩顶沉降与桩端沉降之差求得,群桩的桩端沉降由分层总和法计算。
The compression of the pile in the pile group can be determined by static load test. The settlement of the pile toe is calculated by layer wise summation method.
在弱含水层干扰井群降水计算时,不能按各单井等涌水量考虑,且不一定所有井都对计算点水位降深产生干扰。
On basis of the underground passage project between south and north square of Changchun Station, the dewatering calculation method for interferential well group in weak aquifer is presented.
应用推荐