上述假设即为“加工时间模型”(Processing Time Model)。该模型强调注意资源的有 - 6 - 如果您需要更多资料可以到/week114 进行免费查阅。
基于20个网页-相关网页
用粗糙变量表示不确定的加工时间,在粗糙规划 理论的基础上建立相应的粗糙调度模型,并将其清晰等价化。
By describing the processing time as rough variables, a rough scheduling model is established and is further explicitly equalized. Furthermore, a new cultural algorithm with catastrophe is proposed.
本文将以上两种现代排序模型结合起来,讨论了加工时间可控的分批排序问题。
In this paper, we combine above two kinds of the modern sorts, discuss the batch scheduling with controllable processing times problem.
应用推荐