在半导体制造系统流体网络模型的基础上,建立了以减小平均在制品水平为目标的可分解的优化调度模型。
A scheduling model, with the objective of minimizing the average WIP (work in Process) level, is built based on the fluid network model of semiconductor manufacturing systems.
本模型及算法适用于DNC系统制造自动化车间集成化生产管理及调度。
This modeling and arithmetic is adapted to the integrated production management in automatization workshop based on DNC system.
应用推荐