SI在此再设计项目的初始阶段也负责另一个项目,但是必须把这个项目的开始日期延迟30天,系统集成员才可以参与。
The si is committed to another project during the initial phase of the redesign project, but by delaying the start date of the project by 30 days; the Systems Integrator will be available.
这些边界是架构设计的重要的早期元素,它们马上会关注在开发团队的初始系统分析上。
These boundaries are critical early elements of architectural design, as they immediately focus the development team's initial system analysis.
这份预警机工程和制造初始合同开发阶段包括设计、开发、集成和飞行管理系统单元测试。
The initial contract for the engineering and manufacturing development phase includes design, development, integration and testing of the Flight Management System Suite (FMSS) for the AWACS aircraft.
应用推荐