作为PM采用的一个部分,EPMO通常会引出对常规、计划的报告,个别报告及其内容,及分配列表的需求。
As part of PM adoption, an EPMO typically works to elicit needs and requirements for regular, scheduled reporting, the individual reports and their contents, and a distribution list.
目标2:软件计划、产品和活动与分配到软件部分的系统需求一致。
Goal 2: software plans, products, and activities are kept consistent with the system requirements allocated to software.
论文分析了机场起飞容量和降落容量操作需求,合理分配机场的起降操作,以使机场的计划容量和实际容量相匹配。
This thesis analyzes the demand of the airports departure and landing capacity, and allocates the operation reasonably in order to make the planned capacity match the actual capacity of the airports.
应用推荐