系统任务限制 [计] system task restriction
频分多任务限制 frequency division multiplexing limitations
不应受任何义务的限制 freedom from all obligation
Compared with the traditional critical path method, this method combines the task relation, task constraint type and task classification, so its function is more powerful, and its scope of application is more extensive.
与传统的关键路径算法相比,本文的关键路径算法考虑了任务关系、任务限制、任务分类等内容,功能更加强大,适用范围更加广泛。
参考来源 - 项目管理的时间管理研究·2,447,543篇论文数据,部分数据来源于NoteExpress
这个泳道的并行任务限制值设为1,因为我们希望少用这个类别。
A WIP of 1 was set for this lane, since we want to discourage the use of this category.
任务具有中等弹性限制(弹性限制:不将任务限制到单个日期的弹性限制。
The task has a moderately flexible constraint (flexible constraint: A constraint that is flexible and does not tie a task to a single date.
还可以按照任务限制搜索范围,例如“规划”、“安装”、“使用”、“故障诊断”和“下载”。
You can also limit the search scope by task, such as Plan, Install, Use, Troubleshoot, and Download.