实践证明,二期冷却过渡方案已取得了较好的效果。
In construction practice, the transitional second stage cooling scheme has received good effect.
介绍了秦山核电二期工程反应堆冷却剂系统主设备设计中所涉及的力学分析工作。
This paper introduces the mechanical analysis involved in the design of the main equipment for the reactor and the reactor coolant system for Qinshan Phase II NPP Project.
应用推荐