在那次事故中,有一半核反应堆芯在事故发生后的两小时内便融化了,直到工作人员将误关的应急冷却系统开关重新打开,反应堆芯才停止了融化。
There, half the reactor core melted in the first two hours of the accident. The melting stopped when an operator turned on emergency cooling, which had mistakenly been turned off.
为防止潜水泵在水下工作时漏电而引发触电事故,应装有漏电保护开关。
Submersible pump in order to prevent the work in the underwater leakage accidents caused by electric shock should be equipped with residual current protection switches.
对一起370MVA主变压器分接开关损坏的原因进行了分析,介绍了处理经过,提出了反事故技术措施。
The Tapping switch damaged of a main transformer which power is 370MVA was analyzed, the handling process the measure of preventing accident were provided.
应用推荐