提出了一种变电站两阶段优化规划方法。
This paper proposes a practical two-phase approach to substation optimization planning.
针对动态无功优化方法研究,本文提出了一种多时段无功电压控制的两阶段优化方法。
For studying on dynamic reactive power optimization, a two-phase optimization method of multi-period reactive power and voltage control is proposed to confine the action times of control devices.
为减少无功电压控制设备的动作次数,提出了一种多时段无功电压控制的两阶段优化方法。
A two-phase optimization method of multi-period reactive power and voltage control was proposed to confine the action times of control devices.
应用推荐