介绍了强夯法加固填土地基在东莞大宝化工制品有限公司拟建一期厂房工程中的应用。
An engineering example of consolidating fill ground with heavy punning method is given, which is the planning first phase of the workshop project of Dongguan Dabao chemical products co.
该工程一期三幢厂房已竣工一年,经历一个温度变化周期的使用,效果良好。
The first phase of the project, which includes three factory buildings, had been completed for a year and had experienced a temperature variation period with good effectiveness.
二期工程围左岸主河床 ,右岸明渠 (建于一期 )导流 ,建主河床泄洪坝段及左岸电站厂房。
The second stage is to close the left bank main river bed, divert the stream to the right bank open channel and build the spillway section in the mian river bed and the powerhouse on the left bank.
应用推荐