项目打点体例系确定了协助项目打点团队实施项目整体变换节制的过程。
The project management methodology defines a process that AIDS a project management team in implementing Integrated Change Control for the project.
所以自己们在消费过程中要以节制为主导,不易以查验为目标;
Therefore, we in the production process, we need to control-oriented and difficult to test for the purpose;
本文介绍了节制杆式台车试验系统的工作原理和设计过程。
This paper introduced the sled test system, the principle and design of the car crash simulator system.
应用推荐