第二个估算团队速度的方法是,确定迭代的长度和团队规模,然后决定团队在一个迭代内能完成多少故事。
The second approach to estimating a team velocity is to determine the iteration length and team size, and then decide how many stories the team could complete in an iteration. This is done as follows.
因为大多数for循环处理的复杂逻辑不允许静态地确定迭代次数,因此您不会经常使用这种格式的括号表示。
Because most for loops deal with complicated logic that does not allow the number of iterations to be statically determined, you will not often employ this form of bracket notation.
迭代的方法通过几个迭代步骤确定最终目标节点。
In the iterative methods, the final destination node is determined through several iteration steps.
应用推荐