在污染负荷预测基础上,根据三峡建库前后不同的边界条件,对其最大容许污染负荷量进行了初步分析计算。
Moreover, the permissible pollution load in Xiangxi River is initially analyzed and calculated with different boundary conditions of the Three Gorges Reservoir.
针对该矿山的初步设计中不符合“提速建矿”要求的有关技术问题,进行了深入的分析,提出许多方案并进行对比论证。
Analyzing the relevant problems that do not match with the demand of "accelerating the mine development", the paper makes several plans.
应用推荐