通过自动编程系统可将激光切割的CAD图形自动转换为加工代码,并可自动选择最佳切割顺序,保证最短空程路径;
The automatic programming system can translate the CAD drawing to processing code, optimize the working procedure and processing path.
研究工程图纸和蓝图,确定所需的材料,并计划任务的顺序,最有效地切割金属。
Study engineering drawings and blueprints, determine the materials required, and plan the sequence of tasks to cut metal most efficiently.
建筑结构是由预制的手工混凝土块基座和手工切割的木结构,按照序列及工业的顺序进行重复的操作而建成的。
The structure is built by a basement of precast handmade concrete pieces, and a wooden structure made out of handmade cut pieces, yet through a repetitive process, in series, industrial.
应用推荐