工程实践中很多人提出主次梁上部钢筋交叠问题,困扰无数工程技术人员。
Engineering practice, many of whom overlap made the issue reinforced the upper primary and secondary beam, Plagued many engineering and technical personnel.
TB真空循环脱气装置设备的基础是承载上部荷载的桩基承台钢筋混凝土结构。
Bearing upper load, a reinforced concrete structure with a pile foundation is the foundation of RH-TB vacuum recycling degassing installation.
底层框架—抗震墙结构是山钢筋混凝土框架、抗震墙和上部砖房两种承重和抗侧力体系所构成。
The Sublayer Frame-shear Structure consists of the two kinds of load-bearing and anti - lateral force system in the reinforced concrete frame, the anti-seismic wall and the upside brick house.
应用推荐