ageing of embankment and dam 堤坝工程老化
A dam or embankment is built to keep in the water, which freezes at night and remains frozen in the absence of direct sunlight.
现在已修筑了一道大坝或大堤用以蓄水,水在夜晚会结成冰,在没有阳光直射的情况下也会继续呈冰状。
The new dam consists of an earth core rockfill embankment and a concrete transition at the left abutment.
新建坝包括一座土质心墙堆石堤坝和一个位于左坝肩的混凝土过渡带。
CFRD observation system plays important roles for guidance of embankment filling construction and safety operation of dam after reservoir filling.
面板堆石坝观测系统对指导坝体填筑施工及水库蓄水后坝体的安全运行,具有极其重要的作用。
应用推荐