Results All patients followed up from 3 months to 2 years showed satisfactory results with elevated bridge and tip of the nose and elongated columella.
结果经3个月至2年的随访,所有患者鼻背隆起、鼻尖抬高、鼻小柱延长,形态稳定,效果满意。
The paper introduces the characteristics of the design and construction of deformed continuous steel box beam of Shanghai Gonghexin Road Elevated Bridge over Wenshui Road Station.
介绍了上海市共和新路高架跨汶水路车站的异型连续钢箱梁的设计与施工特点 ,并对其受力特性着重进行探讨分析。
Urban road, highway, elevated road, bridge, square, resident area and etc.
城市道路、高速道路、高架道路、大型立交、桥梁、广场、住宅小区等。
应用推荐