Most of the architecture (described in Part 1) work is performed during the analysis and design workflow, in the elaboration phase of a project.
大多数体系结构(在 第 1 部分中有述)工作是在分析和设计的工作流中、在项目的细化阶段执行的。
Besides, composition, completion, and elaboration as three cognitive processes of conceptual integration theory are also used in the analysis of synaesthetic metaphor.
此外,组合、完善和扩展作为概念整合理论的三个认知过程也将用于分析通感隐喻的形成过程。
This paper discusses the causes of construction project risk, and risk management of construction project is carried out a systematic analysis and elaboration.
本文论述了建筑施工项目风险产生的原因,并对建筑工程施工项目的风险管理进行系统的分析和阐述。
应用推荐