Firstly, the schedule performance prediction problem in the six statues is described. The plan valued rate method, earned duration method and the earned schedule method are then introduced.
首先描述六种项目状态下项目进度预测问题,系统阐述计划价值率法、挣得工期法和挣得进度法的进度预测方法。
C. Crashing is only a viable alternative if earned value analysis indicates that the project is ahead of schedule and under budget.
如果挣值分析表明项目提前于进度计划,并且低于预算,则赶工是惟一一项可行的选项。
Methods for realizing project schedule control using the "earned value evaluation principle" were specially analyzed.
重点分析了运用“赢得值评估原理”实现工程项目进度控制的方法。