Regression testing of system test scenarios occurred during iteration weeks 2 through 6.
系统测试场景的回归测试发生在第 2 到 6 的迭代周中。
The project plan developed during iteration I1 indicated that there would be three production releases - and therefore three evolutions.
在迭代I1中开发的项目计划指示会有三个产品版本——并且因此有三个演进。
It is not necessary to clone the list before iteration or lock it during iteration because the copy of the list that the iterator sees will not change.
在对列表进行迭代之前不必克隆列表或者在迭代期间锁定列表,因为迭代器所看到的列表的副本是不变的。
应用推荐