Firstly, the schedule performance prediction problem in the six statues is described. The plan valued rate method, earned duration method and the earned schedule method are then introduced.
首先描述六种项目状态下项目进度预测问题,系统阐述计划价值率法、挣得工期法和挣得进度法的进度预测方法。
Frequency of calls and duration of method execution are two performance Numbers that should be captured.
调用的频率和方法执行的持续时间是两个应该被获取的性能数字。
Timing constraints: Measures the duration of method calls.
时间约束:测量方法调用的持续时间。
应用推荐