The competent department shall process the application within 2 months of receipt of the application and a dumping permit shall be granted to those approved to dump.
主管部门在接到申请书之日起两个月内予以审批。对同意倾倒者应发给废弃物倾倒许可证。
Koch also increased its dumping of wastewater on weekends when it didn't monitor discharges, circumventing the reporting requirement of its permit, the EPA said.
环保局称,在未监测排放量躲避报告许可要求的时候,科赫公司还在周末增加了抽水量。
Units that have obtained permits for dumping wastes shall dump wastes at the designated place, within the time limit and in accordance with the conditions specified in the permit.
获准倾倒废弃物的单位,应当按许可证注明的期限及条件,到指定的区域进行倾倒。
应用推荐