Pile driving speed, the average 3 minutes can realize piling 6 meters deep, namely a hole three minutes to play.
打桩速度快,平均3分钟可实现打桩6米深,即3分钟可打一个孔。
Through the use of ramp post, spring achieved to provide the side molding characteristics such as a side hole and a hook for driving force.
通过采用斜导柱,弹簧等为动力实现了侧孔,卡钩等注塑件上的侧成型特征。
The paper presented a machine vision system for inspecting the diameter of the tail-hole in a hard disk driving shelf which was needed in mass customization production and inspection.
介绍了在大批量定制生产和检测中所需使用的硬盘驱动架尾孔的机器视觉检测系统。
应用推荐