Toincreaseoutput of coalbedgaswell, we have designed and drilledLan M1-1 coalbed gas multi-branchhorizontal well. With a large coalbed gas reserves, theburieddepthis about 900 m.
For the reserves are the ores that we have drilled, tested, measured, weighed, baked a fluffy cake out of and know that we can mine with current technologies, at current prices, and still make a profit doing so.