If we drill holes in strategic locations, we compromise the load-carrying capacity of the wall.
如果我们在关键位置钻孔,墙的承重强度就会降低。
Iff we drill holes in strategic locations, we compromise the load-carrying capacity of the wall.
如果我们在关键位置钻孔,墙的承重强度就会降低。
By the contrast experiment of 2bmd-12 specific row No-till dill and JD1590 No-till drill in their straw covering field, the capacity of apply fertilizer and ratio of performance and price.
对2bmd - 12型小麦对行免耕播种机和美国JD 1590型进行了对比实验,内容包括机具适应的地表秸秆覆盖情况、施肥能力以及性能价格比等。
应用推荐