The article introduces the construction technology of center drift method for shallow excavation tunnel in Beijing Metro Line 5, analyses the monitored data for the earths surface.
介绍了北京地铁5号线磁器口车站浅埋暗挖隧道中洞法施工技术,对地表监测数据进行了分析。
So we construct for the background by the Second Shizuishan Mining, tunneling of the coal road and rock drift, carried on research to single tunneling technique of the horizontal tunnel.
本文以石嘴山二矿煤、岩巷的掘进施工为背景,对水平巷道单巷掘进技术进行了研究。
During construction of the middle drift of a multi-arch tunnel, collapse accident occurred.
某连拱隧道在中导洞施工时出现坍方。
应用推荐