Internal drawing date 内部绘图日期
DATE OF DRAWING UP 编制的日期 ; 制定日期 ; 制定的日期
Correct Drawing And Date 正确图纸和数据
date of drawing 领取日期
The date of departure is drawing near.
行期已近。
The quality records, labels and quality inspection reports must carry product name, drawing number, quantity, lot number, inspection date, production date and level.
各相关的质量记录、标签、质量检验报告必须标明产品的名称、图号、数量、批次号、检验日期、生产日期及等级。
Determining process plan and calculating relative date, a drawing can be generated automatically by this software. This software is named DCDDI.
该软件在确定工艺方案、计算各类数据后,可自动绘出相应的设计图。
应用推荐