平原围封水库施工期排水措施_建筑工程管理论文 关键词: 平原围封水库;施工期;排水措施 [gap=443]Keywords: plain seal around the reservoir; Construction stage; Drainage measures
基于20个网页-相关网页
Foundation should be surrounded by drainage measures, there is no water phenomenon.
基础四周应有排水措施,不得有积水现象。
The dwelling house and the slope are stabilized by construction of piles in pre-bored holes and improvement of dewatering & cut-off drainage measures.
通过在相应部位施工钻孔灌注桩,完善相关排水、隔水系统等措施,使住宅和边坡达到稳定。
The local and whole stability obviously increased after excavation and reinforcement; if combined with drainage measures will be more conducive to maintaining.
开挖加固后,滑坡体局部和整体稳定性均有显著提高,结合排水措施,将更有利于保持其稳定性。
应用推荐