平原围封水库施工期排水措施_建筑工程管理论文 关键词: 平原围封水库;施工期;排水措施 [gap=443]Keywords: plain seal around the reservoir; Construction stage; Drainage measures
基于20个网页-相关网页
Foundation should be surrounded by drainage measures, there is no water phenomenon.
基础四周应有排水措施,不得有积水现象。
Analysis of the causes of the accident is hydrological geology not clear, the water and drainage measures are not in place.
分析事故原因多为水文地质条件不清,防排水措施不到位等。
The dwelling house and the slope are stabilized by construction of piles in pre-bored holes and improvement of dewatering & cut-off drainage measures.
通过在相应部位施工钻孔灌注桩,完善相关排水、隔水系统等措施,使住宅和边坡达到稳定。
应用推荐