Based on the experience on pipe laying for the landing section of submarine pipeline in recent years, this paper introduces in detail the dragging method, dragging system design, the calculation of pipe dragging forceand the option of dragging equipment, and , describes the dragging method using block and tackle to connect pipe for fitting with domestic equipment.
基于1个网页-相关网页
应用推荐