It is shown that the ground settlement produced by middle zone is greater because of double disturbance during parallel pipe jacking construction.
分析表明,水平平行顶管施工时由于中间区域受到双重扰动,会产生较大的地面沉降。
It shows that the ground settlement produced by middle zone is greater because of double disturbance during parallel pipe jacking construction.
研究结果表明,水平平行顶管施工时中间区域受到双重扰动,产生的地面沉降较大。