dock-wall steps 干船坞台阶
Even worse, the few concrete steps taken involved the in-filling of the unique dock basins and the levelling of much Victorian heritage.
更糟的是,少得可怜的几个明确措施中居然还包括填实独一无二的码头盆地,夷平许多维多利亚时代的遗迹。
This paper puts forward technical targets, sets up mathematical model and practical method and steps for assessing the efficiency of the use of dock.
文章提出了评估船坞或修船平台使用效率的技术指标,建立了相应的评估数学模型,以及具体的评估方法和步骤。
应用推荐