The fact remains that there isn't any "win-win" solution when it comes to the trans-border effects of mass water diversion projects.
事实是,当考虑到跨境大规模调运水资源的影响时,没有“双赢”的解决方案。
By reading reference books, the key technical problems in hydraulic design and calculation for great flood diversion projects are discussed. This provided the basis for study in this paper.
通过查阅有关文献,综述了大型分洪枢纽的水力设计和计算方法中的关键技术难题的现有研究成果,为本文的研究奠定了基础。
The evaluation and control of unforeseen water consumption along the way of water diversion projects is one of the key problems to ensure that enough water can be transferred to the destination.
调水、引水工程沿线非计划用水的评估计算及控制是受水区能否得到足够水量的关键问题。
应用推荐