While not directly related to using lsof, a brief diversion to the /proc directory is in order.
尽管与使用 lsof 没有什么直接的关系,但对 /proc 目录进行简要的介绍是有必要的。
In order to monitor project's safety status of every section it is designed to arrange some interrelated instruments at slope dam spillway and diversion tunnel.
为了监测各工程部位安全状态,设计分别在边坡、坝、洪道、流洞等工程部位布置了相关观测仪器。
Finally, opening the flood diversion work's gate is through blasting or manpower, and the open order influences the discharge and elevation of water in main river.
最后是行洪区得两个口门一般是通过爆破或人工扒口打开,其开启顺序对干流河道水位、流量情况也有一定影响。
应用推荐