A new agent-based dynamic scheduling approach for semiconductor wafer fabrication was proposed, which integrated release control, dispatching and machine preventive maintenance scheduling.
基于智能体技术,提出了芯片制造生产线动态调度新方法,实现了投料调度、工件调度与设备维护调度的集成。
Meanwhile, applying the algorithm to the process of dispatching can improve the scheduling efficiency of requests and cache hit ratio of nodes.
同时,在集群分发过程中应用该算法,可提高请求的调度效率和节点的缓存命中率。
Electric power system load forecasting is one of important operations in dispatching, demanding, scheduling and planning of power system management sectors.
电力负荷预测是电力系统调度、用电、计划、规划等管理部门的重要工作之一。
应用推荐