After the arrival of the equipment in the plant, Party B shall dispatch personnel to install such equipment, while Party a shall arrange personnel to assist the installation.
在设备运抵甲方工厂后,乙方应尽快派出人员进行安装,甲方派出人员进行协助。
Party B shall dispatch the equipment and give a written notice to Party a after repair and maintenance.
协议维修期限内维修完毕后乙方寄给甲方,并以书面的方式通知甲方。
The simulation model discussed in this paper not only can be used for port but also for equipment choice and dispatch, port capacity analysis and operational management.
本文所述的模拟模型不仅可以应用于港口码头系统,还可用于对装卸设备进行合理的选择和调度,整个港口通过能力的分析,以及营运系统的优化管理等。
应用推荐