discusses the optimizing process of treatments of the main technical problemswhich include the construction schedule the field plan and the balance of earth and rock works method of the river closure and cofferdams sections procedure and time of the river colsure form of the cutoff construction of the cut-off wall
论述了对主要技术问题的优化处理过程,包括施工进度、现场规划和围堰截流断面土石平衡的施工方法、截流墙截流施工的程序和时间形式
以上为机器翻译结果,长、整句建议使用 人工翻译 。
应用推荐