The application results of Yunnan electric power system show that the present method is more reasonable and easily meets the demand of adjusting discharge peak.
通过云南电网实际运行检验,所提出的火电调峰方法得到的结果更为合理,更能满足实际电网的调峰要求。
Wetland design can moderate peak flow rate and volume of runoff discharge and sediment deposition during precipitation events.
湿地项目可以缓和雨洪峰值流率及降水过程中的径流排放量和沉淀量。
The influence of peak current on finishing high-speed wire electrical discharge machining (WEDM) in gas and emulsion dielectric is studied.
研究了在大气和乳化液两种介质中,峰值电流对高速走丝电火花线切割加工的影响。
应用推荐