If there is deviation with acceptance criteria, mark and list the DCA code.
如果存在与接受标准的偏离,标记并列出说明偏离的DCA代码。
This paper introduces successful construction method and control measure currently used for holedrill, borehole deviation, protection tube, and embedment and installation of bimetal mark.
介绍了目前比较成功的倒垂孔钻孔、钻孔偏斜、保护管安装、双金属标的埋设及安装等施工方法和控制措施。
应用推荐