It is impossible and costly to carry out detailed buffet analysis in the bridge conceptual phase and many short span bridge designs because the wind load on bridge is complicated.
桥梁风荷载很复杂,在桥梁初步设计阶段没有必要进行精确地抖振分析。
To facilitates the analysis, this paper adopts the computer simulation methods which consist of detailed dynamic cooling load calculations, system simulations and heavy Statistics.
为进行快速有效的分析、验证,本文借助计算机模拟的方法,这主要涉及到详细的空调动态负荷计算和系统模拟计算以及大量的计算结果统计。
This paper gives detailed and accurate analysis to hook gliding at heavy load for gantry crane with the basic principle of electric haulage.
文章运用电力拖动的基本原理对港口门机生产实际中出现的重载溜钩现象进行了详细准确的分析。
应用推荐