A well-designed planning scheme of slope control makes great difference to successful comprehensive harness of the whole small watershed.
坡面治理规划方案合理与否直接决定小流域综合治理的成效。
Developing multiple defense in depths requires planning ahead of time to determine how they should be designed to protect multiple SOAs and avoid overloads at peak times.
开发多个深度防御要求事前进行规划,以确定应如何进行设计,以保护多个SOA和避免在高峰期出现过载。
They designed a task force to fully implement a planning process using monthly sales and operations meetings.
他们设立了一个工作小组,召开月度销售与运营会议来全面实施这一规划流程。
应用推荐