So we must calibrate every seasonal flood frequency in order to make it is the same value to the designed flood frequency of main flood period.
为了使各分期的洪水设计频率等于设计洪水频率,需校核各分期的洪水设计频率。
参考来源 - 水库汛限水位的多目标决策和风险分析·2,447,543篇论文数据,部分数据来源于NoteExpress
The main methods for calculating designed flood are probable maximum precipitation and hydrologic frequency analysis.
设计洪水计算方法主要是可能最大降雨和水文频率法。
The designed discharge and designed flood level are determined by hydrological computation and main characteristic value of highway bridge is checked.
通过桥渡水文计算,确定了设防流量及设防水位,校核了大桥主要特征值;
Designed flood of reservoir is a typical flooding process under given engineering safety standard. The frequency of designed flood is regarded as hydrological risk.
水库设计洪水就是在给定工程安全标准情况下某个典型洪水过程,设计洪水的频率特征表现的就是其水文风险。
应用推荐