Optimization of mine design plan is a multisystem incompatible problem.
矿井设计优选是一个多系统不相容问题。
The plan carrying on the fuzzy reliability optimization design to the spur gear drive will be more economical, reasonable and suitable.
对直齿圆柱齿轮传动进行模糊可靠性优化设计,设计出的方案更经济、合理、适用。
In view of site selection for ore transport system in mine, general plan optimization method of main production logistics system in mine was discussed in combination with engineering design examples.
针对矿山工程设计中物流系统的选址问题,结合工程实例探讨了矿山主要生产物流系统设计的优化方法。
应用推荐