The prestressed RC pipe pile is used in foundation design according to the ground condition, and the calculation settlement satisfies the requirement.
根据工程场地情况,基础采用预应力混凝土管桩,计算沉降量满足要求。
According to requirements of design codes, the post-cast concrete band is generally designed to tolerant the settlement and expansion of high-rise building with longer and large scale basement.
通常对长度较长、面积较大且带地下室的高层板式楼宇等需按设计规范要求设置沉降或伸缩后浇带。
应用推荐