... DP Data Provider数据提供者 DR Derived Requirement派生需求 EPG Engineering Process Group工程过程小组 ...
基于84个网页-相关网页
合理的成本是作为一项派生的需求(derived requirement)被加以考虑的。一旦双方就服务的预期质量达成一致意见后,接下来就要在服务的成本方面协商一致。
基于16个网页-相关网页
DR Derived Requirement 派生需求 ; 派生
The only requirement is that all input variables should be transferred and derived from the XML documents as the service request sent by the requesters.
唯一的要求就是,所有输入变量都在作为请求程序发送的服务请求的XML文档中传输,并从中进行提取。
The main advantage of using FC instead of SLOC is that it can be derived from functional requirement or analysis and design specifications.
使用功能点来代替代码行进行分析的主要优点是,功能点可以从需求、分析、设计规格导出。
It is followed by the implementation of the new contract module in detail, including the class diagram and class methods which are derived from the requirement.
随后对新契约模块的实现做了详细的介绍,陈述了从需求推导而来的类结构图以及类的方法。
应用推荐